TimeTracker RX releases

Toward an integrated management system that anticipates the future, guided by data

TimeTracker, which used to be specialized in Time Management, will evolve, and we will be able to centrally manage project-allocation, profit/cost, quality/risk, and accurately understand the status of the entire organization. This will enable us to accurately understand the status of the entire organization.
TimeTracker RX is a next-generation integrated managementsystem that enables management decisions to be made directly from on-site data.

For details"TimeTracker RX Road Map"See.



Step1: Real-time visualization of project-management, staffing, and income and expenditure

Many project managementtools and ERP tend to be biased towards either 'managing fi financial data' or 'task management for projects'.
For this reason, we ask the following questions from the project-management tools and ERP system-users.


Have you given up on using project-management tools and managed using your own forms such as Excel?
The business planning function of TimeTracker RX ,Project planning, resource allocation, and profitability management are all realized in a single system. By going back and forth between top-down (strategy → staffing → tasks) and bottom-up (field → staffing → costs), we will always keep the company-wide plan up-to-date, consistent, and consistent.
By connecting cost planning, staffing planning, and progress results, management can make quick decisions and the field can move without waste.
The function is realized by dividing it into the following two times.
Part 1: Staffing plan (supported in this version)
Second phase: Profitability control (V2 to be released)

Future-oriented allocation of members based on staffing plans

Assemble the project from "Person Placement".-That is the staffing plan. The "allocation" plan of "who", "when", and "what work" can be done intuitively, and the project plan can be entered directly.
Since Gantt Chart plans and daily results are compiled in real time on the staffing plan screen, it is possible to immediately determine who should be assigned in the event of unexpected work.


more

To Users Using TimeTracker NX

Time Management and project-management functions continue to evolve


  • "Collaborator" reduces the time and effort required for Input work time

    You no longer need to allocate resources to enter the effort in the timesheet. When you add a user as a collaborator, the user's timesheet will View the project's work items in advance, allowing you to enter the effort immediately.

    Individual assignment work is reduced, and preparation man-hours can be reduced.

  • "Authority organization" provides cross-departmental authority collectively.

    When you assign a privilege organization to a member, the privileges apply to the projects and analyses associated with that privilege organization. You no longer need to add users individually for each project to grant permissions or change the organization to which the users belong.

    The man-hours required for granting and updating privileges across organizations can be reduced.

  • Freely set the initial value of "How to determine the field value"

    Enables you to specify default items for the "Value Determination" of each field in the Gantt Table.
    This eliminates the need to change the settings each time you create an item, and allows you to apply predefined formulas smoothly.

  • Efficient daily WBS editing

    Reduced the steps required to populate and view work items and update resource allocations, such as batch entry by drag-fill, copying link between work items, referencing and updating resource allocations through Excel, and direct editing and referencing of multi-line text on the Gantt table.
    We are committed to the detailed editing of our daily activities and continue to improve them.

In addition to the above, stability and operability have been improved.

more